I love it when a plan comes together!
Last night I fastened down two 8’ sheets of plywood cut down to 30” width. This morning, I plotted out the track plan from the XTrackCAD plan and made a couple of minor adjustments.
|
view of Watt St Yard at Charleston looking North. Cars are drilled from the south end, but all tracks are accessible from the north end. Potential “escape route” if the A/D tracks get full. |
|
North end looking back. The N&W boxcar is spotted at East Side Printing. To the left, at the front of the layout, is the. Caboose track, off of the thoroughfare/ overflow track, will be accessed mostly from the other end. |
|
View of the north end of the yard.
The curve to the right goes to the RIP tracks over the work bench. The two stub tracks at center-right are MoW/storage tracks. The track left of the storage tracks will go through the wall to a chemical plant on the Hillsdale Spur. The main track in red also goes through the wall to a helix up to the upper level.
City Bakery to the left where the covered hopper is spotted.
|